| Cost savings can come from: |
| |
• Concrete savings from
reduced footing sizes
• Elimination of pile caps and grade beams
• Elimination of the need to overexcavate and re-compact
fill
• Ability to earth-form Geopier-supported spread footings
• Reduction in project schedule due to speed of Geopier
installation
• After pier installation is complete, the site is left clean, neat and ready for footing excavation.
• No surprises. Once the Geopier system has been installed,
uncertainty has been eliminated |